Highway 97 between Summerland and Peachland was expected to reopen Wednesday, but a new crack in the hillside has delayed work on the slope. File photo

UPDATE: New crack discovered above rockslide leaves B.C. highway closed

Highway 97 between Summerland and Kelowna was expected to reopen Wednesday

Highway 97 north of Summerland remains closed as crews continue to work to stabilize the rock face.

A week ago, on the evening of Jan. 31, a rock slide affected the highway just north of Summerland. While the road was still open that evening and the following day, conditions have changed and it has been closed since Friday night.

Crews had hoped to have the highway opened by Wednesday afternoon, but on Wednesday morning, a new and significant crack was discovered approximately 50 metres north and south of the current failure.

RELATED: New crack in hillside delays Highway 97 reopening

Mike Lorimer, Executive Director of Highway Operations for the Southern Interior Region, said efforts are being made to stabilize the rock face, but the road remains closed without a projected date of when it could reopen.

“We don’t have a time line for that,” Lorimer said. “The ‘when’ will be when it’s safe.”

However, he added that the delay is likely to last for days rather than for weeks before the road will be reopened.

Crews are working on the upper part of the slide area to stabilize the rock face.

RELATED: Crews have removed more than 500 cubic metres from rock slide site

Lorimer said the crews are dealing with extreme weather conditions during some of the coldest days of the winter.

“It’s some pretty ugly conditions,” he said. “With the winds and the temperatures, it’s pretty challenging.”

Until the road is reopened, two detours are in place.

One of the detours involved Highway 3A, Highway 3, Highway 5A and Highway 97.

Another detour, for vehicles five tonnes or less followed the 201 Forest Service Road. The road can be accessed via Warren Avenue and Carmi Avenue in Penticton and off Highway 33 near McCulloch Road in Kelowna. Signage and traffic control have been installed at both locations.

The speed limit along this road is 50 kilometres an hour.

“The detour routes are not ideal by any stretch of the imagination.” Lorimer said.

While ministry officials are looking at alternate routes, he advises against motorists using unmarked detour routes.


Steve Kidd
Senior reporter, Penticton Western News
Email me or message me on Facebook
Follow us on Facebook | Twitter | Instagram

Just Posted

BCSS graduates off to new adventures

The BCSS Class of 2019 is the 50th cohort of Grade 12s from the school

Bunkhouse opens at Midway museum

Operators expect the nightly fee to be around $30

Chamber of commerce adjusts course after 2018 overspend

Businesses have already seen support this year from a downtown revitalization expert

Midway seniors voice hopes, fears for aging in village

The village will host another public forum on aging on July 17

Category 3 fires to be prohibited in Southeast Fire District

The prohibition will take effect at noon on Wednesday, June 12

PHOTOS: Elusive ‘ghost whale’ surfaces near Campbell River

Ecotourism operator captures images of the rare white orca

Victoria mom describes finding son ‘gone’ on first day of coroners inquest into overdose death

Resulting recommendations could change handling of youth records amidst the overdose crisis

Dash-cam video in trial of accused cop killer shows man with a gun

Footage is shown at trial of Oscar Arfmann, charged with killing Const. John Davidson of Abbotsford

Suicide confirmed in case of B.C. father who’d been missing for months

2018 disappearance sparked massive search for Ben Kilmer

Eight U.S. senators write to John Horgan over B.C. mining pollution

The dispute stems from Teck Resources’ coal mines in B.C.’s Elk Valley

Threats charge against Surrey’s Jaspal Atwal stayed

Atwal, 64, was at centre of controversy in 2018 over his attendance at prime minister’s reception in India

Anti-vaxxer Robert F. Kennedy Jr. to speak in Surrey

He’s keynote speaker at Surrey Environment and Business Awards luncheon by Surrey Board of Trade Sept. 17

Otters devour 150 trout at Kootenay hatchery

The hatchery has lost close to 150 fish in the past several months

B.C. church’s Pride flag defaced for second time in 12 days

Delta’s Ladner United Church says it will continue to fly the flag for Pride month

Most Read