BC Hydro launches second phase of vehicle charging stations across southern B.C.

Stations are located in Metro Vancouver, Vancouver Island, East Kootenay and Okanagan

BC Hydro is expanding its network of electric vehicle charging stations.

The Crown utility says 28 new stations complete the second phase of its fast-charging network and are in addition to the 30 stations opened in 2016.

Thirteen of the stations are in Metro Vancouver, seven are on Vancouver Island, including one at the Pacific Rim Visitor Centre near Tofino, another is in Campbell River, and two have opened on the Coquihalla Highway at the Britton Creek rest area.

A further six stations are located throughout the East Kootenay and BC Hydro says the next phase of its program will connect drivers travelling between Kamloops and Prince George, while stations in Prince Rupert are also being planned.

Hydro spokeswoman Mora Scott says the stations can charge an electric vehicle to 80 per cent in just 30 minutes, at a cost of 35 cents per kilowatt hour.

Mora Scott says that translates to roughly $3.50 for the equivalent of a full tank of gas in the average four-cylinder car.

“The number of electric vehicles on B.C. roads is increasing, there’s currently around 9,000 across the province, and we actually expect that number to rise to 300,000 by 2030,” Scott says in a news release.

In partnership with municipalities, regional districts and several businesses, BC Hydro has been installing charging stations throughout the province since 2012 with support from the provincial and federal governments.

Scott says the utility wants to ensure the stations are placed where drivers need them so charging options are available provincewide.

“One big thing that we know drivers of electric vehicles worry about is the concept called range anxiety, that the stations aren’t going to be where they need them,” she says.

Several models of electric vehicle are now capable of travelling up to 500 kilometres on a single charge, says Scott.

Hydro president Chris O’Riley says the new charging sites will encourage electric vehicle drivers to explore B.C. this summer. (The Canadian Press, CHNL)

The Canadian Press

Like us on Facebook and follow us on Twitter.

Just Posted

It’s the last day to vote in B.C.’s referendum on electoral reform

Ballots must now be dropped off in person to meet the deadline of 4:30 p.m.

How to decide what to vote for in B.C.’s referendum on electoral reform

Ballots are due at Elections BC on Friday, Dec. 7, at 4:30 p.m.

Lawyer for Chinese exec detained by Canada says it’s ‘inconceivable’ she would flee

Meng Wanzhou was detained at the request of the U.S. during a layover at the Vancouver airport

Federal government plans examination of coerced sterilization

The Liberals have been pressed for a rapid response to recent reports on the sterilizations

Huitema, Cornelius named 2018 Canadian Youth International Players of the Year

Huitema was captain of Canada’s fourth-place team at this year’s FIFA U-17 Women’s World Cup

Canada not slowing emissions from oil and gas: environmental groups

New report released at the United Nations climate talks in Poland

Liberal Party moves Trudeau fundraiser from military base

The fundraiser is scheduled for Dec. 19, with tickets costing up to $400

Pipeline protesters arrested at B.C. university

Three protesters were arrested after TRU property allegedly vandalized with red paint

Goodale to ‘examine’ transfer of Rafferty to medium-security prison

Michael Rafferty was sentenced to life in prison in 2012 in the kidnapping, sexual assault and first-degree murder of Tori Stafford

‘Abhorrent’ condition of autistic B.C. boy shows flaws in care system: report

‘Charlie’ was underweight and ‘covered in feces’ when he was removed from his mom’s care

Minister appoints former CIRB chair to resolve Canada Post labour dispute

Postal workers engaged in weeks of rotating walkouts

Most Read