Artist's rendering of Site C dam on Peace River. The B.C. government is expected to decide this year whether to start construction in 2015.

Don’t rush Site C dam, mayor urges

The community most affected by the proposed third dam on the Peace River is urging the B.C. government to get more answers

The community most affected by the proposed third dam on the Peace River is urging the B.C. government to get more answers before going ahead.

Hudson’s Hope Mayor Gwen Johansson made the rounds of Vancouver media this week, backed up by a consultant’s report that questions the need for the $8 billion project assessed by a federal-provincial joint review panel this spring.

Energy Minister Bill Bennett has said the cabinet will consider the federal panel’s report and decide this fall whether to issue permits to allow construction to begin in 2015.

The report by planning and engineering consultants Urban Systems reinforces many of the doubts expressed by the joint review panel, including the cost of the dam and the alternatives available to meet anticipated power demand.

Those options include upgrading the gas-fired Burrard Thermal generating station in the Lower Mainland. The federal review estimated that upgrade could be done for the $1 billion that BC Hydro would pay in interest on the debt generated by the Site C dam.

Urban Systems looked at other options, including geothermal, solar, new natural gas generation and “microgrids” with distributed power from solar or other small sources.

Johansson said the dam would flood more productive farmland in the Peace River valley, and commit the region to another big power source for 100 years at a time when small, distributed sources are becoming competitive.

“Hudson’s Hope has done its bit,” Johansson told CBC radio Wednesday. “We have suffered the consequences of the Bennett Dam and Peace Canyon dam. If there are alternatives I think we should have a really close look at them.”

The Urban Systems report compares Site C’s estimated power cost of $110 per megawatt hour with a new gas cogeneration plant in Calgary that is expected to cost $30 per megawatt hour.

Johansson echoed the joint review panel and NDP leader John Horgan’s call for Site C to be reviewed by the B.C. Utilities Commission, to assess its cost estimates and BC Hydro’s projections for future electricity demand.

 

Just Posted

RDKB to test emergency alert system

The alarm is scheduled to go out at 10:30 a.m. on June 21

BCSS graduates off to new adventures

The BCSS Class of 2019 is the 50th cohort of Grade 12s from the school

Greens choose Rosslander to represent them in next federal election

Tara Howse is the former chair of Rossland’s Sustainability Commission

Chamber of commerce adjusts course after 2018 overspend

Businesses have already seen support this year from a downtown revitalization expert

Midway seniors voice hopes, fears for aging in village

The village will host another public forum on aging on July 17

VIDEO: Rare white killer whale captured by drone near Campbell River

The transient orca has been named Tl’uk, a Coast Salish word that means ‘moon.’

B.C. imposes interim moratorium on resource development to protect caribou

The caribou population in northeastern B.C. has dwindled over the last two decades

B.C. sculptor depicts epic eagle battle in latest piece that took 2,500 hours

Clasped in one of the raptor’s talons is each one’s desire: a living venomous diamondback rattlesnake

Students disciplined after anti-LGBTQ signs posted in Kamloops high school

Vessy Mochikas, SD73’s principal for inclusive education, called incident a learning opportunity

Air Canada expects Boeing 737 Max to resume flying by September or October

Air Canada isn’t worried about safety of the planes, says vice-president

‘The Fonz’ gives thumbs up in letter to dyslexic students at B.C. school

Students in Maple Ridge reached out to Henry Winkler after reading one his Zipster books.

PHOTOS: MP Mark Warawa loses brief battle with cancer

The Conservative Member of Parliament and long-time community advocate died in hospice this morning

Fernie’s Kerri Wall hopes to represent Green Party in federal election

Nelson’s Abra Brynne and Kaslo’s Judson Hansel have also chosen to run

Most Read