LNG Canada CEO Andy Calitz announces project proceeding to engineering and environmental assessment

Shell postpones LNG decision to late 2016

Shell, Mitsubishi, Korea Gas and PetroChina agree to stick with Prince Rupert project despite world-wide oil and gas price slump

With a world-wide slump in oil and natural gas prices extending further than expected, the Shell-led liquefied natural gas project proposed for Kitimat has delayed its final investment decision until the end of the year.

Backed by a consortium of Shell Canada, Korea Gas, Mitsubishi and PetroChina, the LNG Canada project is a key part of the B.C. government’s bid to enter the global LNG export market. Along with delays on the Petronas-led Pacific Northwest LNG proposed for Prince Rupert, the chances of a large LNG project being under construction by the 2017 provincial election have faded.

Premier Christy Clark was attending an industrial development conference in Ottawa when the delay was revealed in Shell’s quarterly update. As with other global energy companies, the glut of oil resulted in a 44 per cent in earnings for Shell compared to the same quarter last year.

Clark, who rode the prospect of an LNG revenue bonanza to victory in the 2013 B.C. election, acknowledged that the delay is significant.

“What I was pleased to see, though, is that Shell has reconfirmed its intention to make a final investment decision this year, even in these very uncertain times,” Clark said.

LNG Canada CEO Andy Calitz was attending the same conference and he noted that the delay means all four international partners have agreed to stay with the project.

“LNG Canada is in great shape as a project,” Calitz said. “We have all our federal and provincial environmental approvals in place, and the National Energy Board recently decided that they support a 40-year export licence.”

Related: NDP MP seeks tax break for Douglas Channel LNG

Another factor in the delay is the ongoing Shell takeover of British Gas Group, which had its own proposal to build a pipeline and LNG terminal in the Prince Rupert area.

LNG Canada has an agreement with TransCanada Corp. to build a pipeline through the Rocky Mountains from northeastern B.C., where Shell and others have major gas drilling operations in the Montney shale near Dawson Creek and other gas-rich formations.

Pacific Northwest LNG is still waiting for its federal environmental permit, after redesigning its LNG tanker port proposed for Lelu Island near the Prince Rupert port. Local protests have dogged the project over its potential impact on salmon in the Skeena River.

 

Just Posted

Avalanche Canada issues special public warning

Very weak layer buried under recent snow a cause for concern

From the Hill: The millstone of a cannabis conviction

Richard Cannings writes about records expungement for cannabis convictions

Tips for avoiding Canada Revenue Agency scams

Grand Forks RCMP are asking residents to be vigilant.

Grand Forks celebrates the holidays with Santa Claus parade, light up

The Christmas tradition was a hit on Friday night.

RDKB receives funding for disaster response ‘work space’ in Midway

The work space and storage will be used by disaster response volunteers.

VIDEO: Ex-NASA engineer pranks mail thieves with glitter bomb trap

Package thefts are common this time of year, but YouTuber Mark Rober used his engineering skills

UBC study could spare cancer patients from side effects of radiation

Her research has drawn a connection of Chromosome 6 genes to pulmonary fibrosis susceptibility.

Snowfall warning issued for Coquihalla, Highway 3

Make sure to equip winter tires if travelling

‘Laverne & Shirley’ star, ‘Big’ director Penny Marshall dies

Marshall died of complications from diabetes on Monday, Dec. 17, 2018, at her Hollywood Hills home. She was 75.

B.C. Court of Appeal to rule in terror case that centres on RCMP conduct

B.C.’s appeal court is scheduled to release a decision today on a couple whose guilty verdict over plotting to blow up the provincial legislature was thrown out by a lower court judge.

Trump backs off on demand for $5 billion to build a border wall

Congress and President Donald Trump continue to bicker over his demand that lawmakers fund a wall along the U.S.-Mexico border.

Canadian detained in China, not clear if related to two other detentions

Reports suggest the person is not a diplomat or entrepreneur doing business in China.

Trudeau sees 2019 election as choice between positive Liberals, divisive Tories

Trudeau is drawing much the same battle lines that propelled the Liberals to a come-from-behind victory in 2015

Lightning top Canucks 5-2 in feisty battle

NHL’s No. 1 team too much for Vancouver

Most Read